page_banner

news

There are some details that need to be paid attention to during the installation of the anti-hail net:
1. The two sewn nets are related to each other when they are erected. Nylon thread or Ф20 thin iron wire is used. The fixed distance of connection is 50cm, which can be increased or decreased as appropriate.
2. Measure the length of the ground first. The length of the net is greater than the length of the ground. Because the net is elastic, the net cannot be completely straightened during the pulling process.
3. When the ground anchors and cement pillars are buried, it is best to squeeze the ground anchors and the surrounding pillars with a tamper to prevent the pillars from being tilted by strong winds.
4. The tighter the bracket is when it is pulled, the better, and an extra 1 meter should be left at both ends to prevent reconnection after disconnection.
5. The pillars are best used after soaking in asphalt to prevent corrosion and prolong service life.
6. The surrounding cement pillars should be buried in one year and used for many years, and the pillars can be buried in the same year.
7. The upper end of the pillar should be kept flat after laying the anti-hail net. According to the unreasonable terrain, the principle of burying more high and less buried is adopted. It must be ensured that the distance between the net and the ground is greater than or equal to 2m.
8. The top of the pillar is sawed flat before use.
9. Label each wire clearly when collecting it every year.


Post time: Jun-17-2022